If your utility is buying or replacing transformers with federal financial assistance, country of origin is part of the purchase — not a detail to sort out later.

The Build America, Buy America Act, enacted on November 15, 2021 as part of the Infrastructure Investment and Jobs Act, established a domestic content preference for federal financial assistance obligated for infrastructure projects after May 14, 2022. The Department of Energy and the Office of Management and Budget apply that preference through 2 CFR part 184 and through DOE award terms.

When the preference applies

The Buy America Preference applies to federal financial assistance awarded to non-federal entities — including local governments — when the project includes the construction, alteration, maintenance, or repair of public infrastructure in the United States. For this purpose, infrastructure includes electrical transmission facilities and systems, utilities, and structures, facilities, and equipment that generate, transport, and distribute energy.

A municipal electric system is typically “public” infrastructure because it is publicly owned. The preference applies to the entire infrastructure project, even when the project mixes federal funds with recipient cost share or other non-federal money. It also flows down to subawards, contracts, and purchase orders.

The preference applies to iron, steel, manufactured products, and construction materials that are consumed in, incorporated into, or permanently affixed to the project. It does not apply to tools and temporary supplies brought to the site and removed later.

A utility that buys transformers only with its own revenues, and without federal assistance in the project, is usually outside this federal preference. Local and state purchasing rules still apply. The federal rules enter when a grant, a loan, or another federal program pays for part of the work.

What “produced in the United States” means for a transformer

Covered items are classified in one category at the time they are brought to the work site: iron or steel products, manufactured products, construction materials, or certain excluded materials such as cement and aggregates.

A finished distribution transformer is generally a manufactured product, not a construction material. Construction materials are a short list of items such as non-ferrous metals, glass, lumber, and drywall. Classification can depend on the item as it arrives, and on whether it consists predominantly of iron or steel, so the awarding agency’s terms control the final call.

For manufactured products, “produced in the United States” means two things. The product must be manufactured in the United States. And the cost of the components that are mined, produced, or manufactured in the United States must be greater than 55 percent of the total cost of all components, unless another applicable law sets a standard that meets or exceeds that threshold.

Prime recipients must keep certifications or equivalent documentation from suppliers and manufacturers, and be able to produce that file if DOE, an auditor, or the Inspector General asks for it. A nameplate that says “Made in USA” is a start. It is not, by itself, the certification file the award may require.

Waivers exist, but they take time

DOE may waive the preference when applying it would be inconsistent with the public interest, when the items are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality, or when using U.S.-produced items would increase the cost of the overall project by more than 25 percent. Waiver requests are reviewed by DOE and OMB, posted for public comment, and can take up to 90 calendar days to process. DOE’s determination is not appealable.

Municipal utilities are already using that process. In 2026, DOE issued a project-specific nonavailability waiver to Fort Pierce Utilities Authority, a Florida municipal utility, for certain components on a federally funded upgrade of two substation transformers. The waived items included transformer oil, radiators, nameplates, a control cabinet, magnet, and wiring — a reminder that origin questions can reach components, not only the finished tank.

What this means for the gear you already have

If federal money may fund a future replacement or a grant-supported rebuild, it helps to know where your installed transformers, and their documented components, came from before you write the specification. An origin memo built from nameplate photos and invoices can put that information in one place, in plain language, with a keep, watch, or replace finding for each asset.

That memo is not a Buy America determination, not a waiver request, and not legal advice. We do not decide whether equipment meets the preference, whether a project is covered, or how an award should be administered. We trace origin from the paperwork you send.